Belmont Primary School

    Appointed by Redcar & Cleveland Borough Council, Logic undertook an asset review of the existing KS1 & 2 buildings before preparing a site wide masterplan for the rationalisation of the site to increase capacity to Two Form Entry as cost effectively as possible.

    The Logic...

    Having undertaken a full review of the existing school assets utilising ESFA Building Bulletins, Logic proposed a masterplan that relocated the private nursery provider from within the KS1 building to the existing redundant caretakers bungalow. This, in addition to some reconfiguration and an extension enabled classrooms within the original 'infant' and 'junior' buildings to be reallocated returning the school to a clear split in Key stages to reduce the need for children and staff to continually move between the two. To fully satisfy the anticipated role increase further expansion was identified to the administration areas together with a new contemporary entrance to update the schools appearance.

    Completed 2020

    Corporation Road, Middlesbrough

    Appointed by Chaloner Group, Logic was commissioned to design a multi-storey residential building that would maximise density built within the footprint of the former Cleveland Scientific Institute building.

    view project

    Tower Green Village

    Mountain Bike Centre

    Logic was appointed to prepare a feasibility study to create a mountain bike centre proposed for an undulating rural site.

    view project